The Challenge
A rare explosion on a major university campus led to the closure of two dormitories, including a campus dining facility, displacing more than 1,300 students. The damage led to the need for a new dining facility that would require 14 serving lines be designed, engineered, manufactured, and installed in under four weeks.
The Solution
Duke’s representative, Inform Marketing was approached with the university’s predicament and a floor plan. Inform knew Duke’s team at CounterCraft™ was the team for the job. Presented with the challenge, CounterCraft™ worked quickly and fiercely, exhausting every resource to build 14 counters in an unprecedented time frame. With teamwork, open communication, hard work and a dedicated effort, the team pulled off the feat designing, engineering, manufacturing, shipping, and installing the counters in under four weeks’ time. This effort minimized the downtime for students to the minimum allowable time and gave the University the capacity to begin feeding the 1,300 students that were affected again. The counters built for UNR featured: